Mariners' Advisory Committee
for the Bay & River Delaware
www.MacDelRiv.org
   
Posted   04-04-2026 18:37  
By   DJH  
 
Per Monroe Energy:

Soundings were performed at the ship dock on 04/03/26. There are changes to the ship dock.

Ship dock:

· The current minimum depth referenced to the MLLW datum is 40.0 feet (12.19 m)
· As the terminal has a 1-foot under-keel clearance policy, the maximum allowable FW draft for all stages of the tide is 39.0 feet (11.89 m)

The hydrographic survey for the ship dock is attached.
View Attachment 1 (.JPEG)