(Per Monroe Energy): The post – dredge (Phase 1) dock sounding was performed at the ship dock on 1/31/25. Barge Dock remains the same.
Ship Dock: Current depth at the ship dock, referenced to the MLLW datum, changes to 33.0’ (10.02 m). The terminal has a 1-foot minimum UKC requirement. The maximum allowable FW draft is 32.0’ (9.75 m).
Barge Dock: Current depth at the barge dock, referenced to the MLLW datum , remains at 28’00”. The terminal has a 1-foot minimum UKC requirement. The maximum allowable FW draft is 27’ 00”.
The hydrographic survey for the ship dock is attached.
View Attachment 1 (.JPEG)
|