Mariners' Advisory Committee
for the Bay & River Delaware
www.MacDelRiv.org
   
Posted   09-11-2023 18:12  
By   DJH  
 
(Per Monroe Energy): The dock soundings were performed at the ship and barge dock on 9/7/23 . The ship dock depth has changed.

Ship Dock: Current depth at the ship dock, referenced to the MLLW datum, is changed to 38’00” (11.58 m). The terminal has a 1-foot minimum UKC requirement. The maximum allowable FW draft is 37’ 00” (11.27 m).

Barge Dock: Current depth at the barge dock, referenced to the MLLW datum , remains at 30’00”. The terminal has a 1-foot minimum UKC requirement. The maximum allowable FW draft is 29’ 00”.

The hydrographic surveys are attached.
View Attachment 1 (.JPEG)