Mariners' Advisory Committee
for the Bay & River Delaware
www.MacDelRiv.org
   
Posted   06-28-2023 21:44  
By   DJH  
 
(Per Monroe Energy): The dock soundings were performed at the ship dock on 6/21/23 and at the barge docks on 6/15/23. . The ship dock depth has changed.

Ship Dock: Current depth at the ship dock, referenced to the MLLW datum, is changed to 39’00” (11.88 m). The terminal has a 1-foot minimum UKC requirement. The maximum allowable FW draft is 38’ 00” (11.58 m).

Barge Dock: Current depth at the barge dock, referenced to the MLLW datum , remains at 30’00”. The terminal has a 1-foot minimum UKC requirement. The maximum allowable FW draft is 29’ 00”.

The hydrographic survey for the ship dock is attached.
View Attachment 1 (.JPEG)