(Per Monroe Energy): The post dredge dock soundings were performed at the ship and barge docks on Wednesday 3/8/23. . Both dock depths have changed.

Ship Dock: Current depth at the ship dock, referenced to the MLLW datum, is changed to 40’00” (12.19 m). The terminal has a 1-foot minimum UKC requirement. The maximum allowable FW draft is 39’ 00” (11.88 m).

Barge Dock: Current depth at the barge dock, referenced to the MLLW datum , is change to 30’00”. The terminal has a 1-foot minimum UKC requirement. The maximum allowable FW draft is 29’ 00”.

The hydrographic survey for the ship dock is attached.
View Attachment 1 (.JPEG)