(Per Monroe Energy): Dock soundings were performed at the ship and barge docks on Wednesday 8/17/22. Below are the dock depths after review of the sounding results. No change to either the ship or barge dock depths.



Ship Dock: Current depth at the ship dock, referenced to the MLLW datum, is unchanged at 38’00” (11.58 m). The terminal has a 1-foot minimum UKC requirement. The maximum allowable FW draft is 37’ 00” (11.27 m).



Barge Dock: Current depth at the barge dock, referenced to the MLLW datum , is unchanged at 30’00”. The terminal has a 1-foot minimum UKC requirement. The maximum allowable FW draft is 29’ 00”.



The hydrographic surveys for the ship is attached.