Marcus Hook Range Dredging Work(per NDC):
Commencing 2/21 late morning, The Dredge Essex will perform work on the RED side of the channel on Marcus Hook Range with the Charleston sub-line, which is on the green side. This means we will be blocking the channel with float line. This work will only last approximately 12-18 hours. We are requesting that traffic passes thru the anchorage during this time. We will be able to swing the dredge toward the center line to open up about 150ft of the RED side if necessary. As always, please contact the dredge with as much notice as possible.
|