(Monroe Energy): Dock soundings were performed at the ship and barge docks on Thursday 5/5/22. Below are the dock depths after review of the sounding results. The ship dock has a change but not the barge dock.



Ship Dock: Current depth at the ship dock, referenced to the MLLW datum, is revised to 38’00” (11.58 m). The terminal has a 1-foot minimum UKC requirement. The maximum allowable FW draft is 37’ 00” (11.27 m).



Barge Dock: Current depth at the barge dock, referenced to the MLLW datum , is unchanged at 30’00”. The terminal has a 1-foot minimum UKC requirement. The maximum allowable FW draft is 29’ 00”.



The hydrographic survey for the ship dock is attached.