By   DJH  
 
(Monroe Energy): Post Dredging Soundings were performed at the ship and barge docks on Wednesday 1/19/22. Below are the dock depths after review of the sounding results. The ship dock is back to full depth.

Ship Dock: Current depth at the ship dock, referenced to the MLLW datum, is revised to 40’00” (12.19 m). The terminal has a 1-foot minimum UKC requirement. The maximum allowable FW draft is 39’ 00” (11.88 m).

Barge Dock: Current depth at the barge dock, referenced to the MLLW datum , is unchanged at 30’00”. The terminal has a 1-foot minimum UKC requirement. The maximum allowable FW draft is 29’ 00”.

The hydrographic survey for the ship dock is attached.
View Attachment 1 (.JPEG)